GenCost 2023-24 report

The 2023-24 release was shaped by an unprecedented level of industry participation.

Key findings

  • Renewables (solar and wind + firming) remain the lowest cost new build electricity technology.
  • Large-scale nuclear technology costs included for the first time.
  • Future wind costs revised upwards.
  • An extensive FAQ section addressing common questions from current and past consultations.

Read the Executive Summary PDF (498 KB)

Next steps

The GenCost 2024-25 draft report will be released in the final quarter of 2024. The consultation process will gather stakeholder feedback for at least six weeks.

A stakeholder webinar will take place during the consultation process to discuss the report's key insights and its role in AEMO's forecasting and planning activities. Details to be advised.

The final GenCost 2024-25 report will be released in the second quarter of 2025.

AEMO's Integrated Systems Plan

GenCost is an important input into AEMO's Integrated Systems Plan (ISP).

Updated every two years, the ISP outlines the lowest-cost investment to ensure Australians can access reliable, secure and affordable electricity, while meeting our national emission reduction targets. It provides a comprehensive roadmap for developing generation, storage and transmission as ageing coal-fired power stations retire.

The most recent ISP was published by AEMO on 26 June, 2024.

What is GenCost?

GenCost is a leading economic report for business leaders and decision-makers planning reliable and affordable energy solutions to achieve net zero emissions by 2050.

Published annually in collaboration with the Australian Energy Market Operator (AEMO), GenCost offers accurate, policy and technology-neutral cost estimates for new electricity generation, storage, and hydrogen technologies, through to 2050.

GenCost is highly collaborative and transparent, leveraging the expertise of energy industry stakeholders and involving extensive consultation to ensure accuracy prior to publication.

Transcript to be supplied

CSIRO is committed to ensuring its online content is accessible to everyone regardless of ability.

Request accessibility assistance

GenCost is an annual collaboration between CSIRO, Australia’s national science agency, and the Australian Energy Market Operator (AEMO) to update the costs of new-build electricity generation, storage and hydrogen production out to 2050.

Share & embed this video

Link

https://vimeo.com/896412073?share=copy

Copied!

Embed code

<iframe src="//player.vimeo.com/video/896412073?share=copy" width="640" height="360" frameborder="0" allow="autoplay; fullscreen" allowfullscreen></iframe>

Copied!

GenCost 2023-24 report

Explore key insights from the latest report.

GenCost projects the cost of electricity generation and storage for a wide range of technologies up to the year 2050.  

 

Renewables remain lowest cost

The report highlights wind power’s slower recovery from global inflationary pressures, resulting in upward revisions for both onshore and offshore wind costs over the next decade.

Despite this, updated analysis reaffirms that renewables, including associated storage and transmission costs, remain the lowest cost, new build technology out to 2050.

This competitive position reflects a decade of cost reductions in wind, solar photovoltaics (PV) and batteries before the pandemic. This is in contrast with costs of mature competitors which have remained flat.

Large-scale nuclear costs introduced

The inclusion of large-scale nuclear costs this year was prompted by increased stakeholder interest in nuclear technology following the updated cost estimates for SMRs in the 2023-24 consultation draft.

Applying overseas costs to large-scale nuclear projects in Australia is complex due to the lack of a domestic nuclear industry and significant global differences in labour costs, workforce expertise, governance, and standards.

The GenCost 2023-24 report team estimated large-scale nuclear costs using South Korea’s successful nuclear program. They adjusted for differences in Australian and South Korean deployment costs by comparing the cost ratio of new coal generation in each country.

GenCost found nuclear power to be more expensive than renewables and estimated a development timeline of at least 15 years, including construction. This reflects the absence of a local development pipeline, additional legal, safety and security requirements, and stakeholder evidence. Long development times mean nuclear won’t be able to make a meaningful contribution to achieving net zero emissions by 2050.

Achieving the reported nuclear costs depends on Australia committing to a continuous building program like South Korea’s. Initial units are likely to incur higher costs, and a first-of-a-kind premium of up to 100 per cent is possible, although not included in the cost estimates for nuclear or other new electricity technologies in the report.

Latest news

Contact us

Find out how we can help you and your business. Get in touch using the form below and our experts will get in contact soon!

CSIRO will handle your personal information in accordance with the Privacy Act 1988 (Cth) and our Privacy Policy.


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

First name must be filled in

Surname must be filled in

I am representing *

Please choose an option

Please provide a subject for the enquriy

0 / 100

We'll need to know what you want to contact us about so we can give you an answer

0 / 1900

You shouldn't be able to see this field. Please try again and leave the field blank.