Our Stage 3 Summary Report and final Stage 3 reports below provide an update on the progress of Australia’s Global Power System Transformation (G-PST) Roadmap which was launched in 2022.
Development of the Roadmap represented Stage 1 work which outlined a research path across nine key topics on preparing a power system that provides secure and reliable operation during the energy transition to a decarbonised global electrical grid with high penetration of renewables.
The Stage 3 reports contain summaries for each of the appointed research topics to:
- clearly describe progress in the research topic to the end of 2023/2024.
- map this current research within the overall Roadmap for each G-PST research topic.
- propose future work for the next round of research scheduled for Stage 4 in Financial Year 2024/25.
These Stage 3 reports will be used to:
- explore opportunities to secure additional funding for expansion of the G-PST work into Southeast Asian countries.
- expand research in distributed energy resource (DER) integration as its importance is increasingly internationally recognised.
Executive Summary
- Stage 3 Research Program Summary Report
- Stage 3 Research Program Summary Report
- Stage 3 Presentation Australian Research Leadership in the GPST
Stage 3 Research Reports by Topic
The information in each report has been provided by the research organisations appointed each project.
- Topic 1 — Advanced inverter applications (and requirements) for current-limited grid-forming inverters
- Topic 1 — Advanced inverter applications (and requirements) for current-limited grid-forming inverters
- Topic 2 — Analytical methods for determination of stable operation of IBRs in a future power system
- Topic 2 — Analytical methods for determination of stable operation of IBRs in a future power system
- Topic 3 — Control Room of the Future
- Topic 3 — Control Room of the Future
- Topic 4 — Planning
- Topic 4 — Planning
- Topic 5 — The role of inverter-based resources during system restoration
- Topic 5 — The role of inverter-based resources during system restoration
- Topic 7 — Power System Architecture
- Topic 7 — Power System Architecture
- Topic 8 — Distributed Energy Resources (DERs)
- Topic 8 — Distributed Energy Resources (DERs)
- Topic 9 — Distributed Energy Resource and Stability
- Topic 9 — Distributed Energy Resource and Stability
Note: The research topic 6 on Services was not progressed in 2023/24. CSIRO will include Topic 6 in the 2024/25 stage.
Request accessibility assistance
Some elements of the documents included on this page may not be accessible to assistive technologies. Please contact us to request further accessibility assistance.
Our Stage 3 Summary Report and final Stage 3 reports below provide an update on the progress of Australia’s Global Power System Transformation (G-PST) Roadmap which was launched in 2022.
Development of the Roadmap represented Stage 1 work which outlined a research path across nine key topics on preparing a power system that provides secure and reliable operation during the energy transition to a decarbonised global electrical grid with high penetration of renewables.
The Stage 3 reports contain summaries for each of the appointed research topics to:
- clearly describe progress in the research topic to the end of 2023/2024.
- map this current research within the overall Roadmap for each G-PST research topic.
- propose future work for the next round of research scheduled for Stage 4 in Financial Year 2024/25.
These Stage 3 reports will be used to:
- explore opportunities to secure additional funding for expansion of the G-PST work into Southeast Asian countries.
- expand research in distributed energy resource (DER) integration as its importance is increasingly internationally recognised.
Executive Summary
- Stage 3 Research Program Summary Report PDF (2 MB)
- Stage 3 Research Program Summary Report DOCX (10 MB)
- Stage 3 Presentation Australian Research Leadership in the GPST PDF (3 MB)
Stage 3 Research Reports by Topic
The information in each report has been provided by the research organisations appointed each project.
- Topic 1 — Advanced inverter applications (and requirements) for current-limited grid-forming inverters PDF (10 MB)
- Topic 1 — Advanced inverter applications (and requirements) for current-limited grid-forming inverters DOCX (12 MB)
- Topic 2 — Analytical methods for determination of stable operation of IBRs in a future power system PDF (5 MB)
- Topic 2 — Analytical methods for determination of stable operation of IBRs in a future power system DOCX (16 MB)
- Topic 3 — Control Room of the Future PDF (3 MB)
- Topic 3 — Control Room of the Future DOCX (4 MB)
- Topic 4 — Planning PDF (13 MB)
- Topic 4 — Planning DOCX (54 MB)
- Topic 5 — The role of inverter-based resources during system restoration PDF (4 MB)
- Topic 5 — The role of inverter-based resources during system restoration DOCX (5 MB)
- Topic 7 — Power System Architecture PDF (20 MB)
- Topic 7 — Power System Architecture DOCX (29 MB)
- Topic 8 — Distributed Energy Resources (DERs) PDF (2 MB)
- Topic 8 — Distributed Energy Resources (DERs) DOCX (37 MB)
- Topic 9 — Distributed Energy Resource and Stability PDF (11 MB)
- Topic 9 — Distributed Energy Resource and Stability DOCX (56 MB)
Note: The research topic 6 on Services was not progressed in 2023/24. CSIRO will include Topic 6 in the 2024/25 stage.