Blog icon

The challenge

Maintaining coal seam gas (CSG) wells

CSG is becoming a widely used energy source, particularly in eastern Australia where a number of basins have been found to produce significant volumes of methane gas from coal seams.

However, the drilling and maintenance of CSG wells are gradually becoming less economically viable as a result of low gas prices, and the comparably high price of maintaining and drilling CSG wells. Furthermore, the life span of a coal seam production well is only approximately 10-20 years.

Our response

Microbial Enhancement of CSG

The Microbial Enhancement of Coal Seam Methane (MECSM™) project (now called Reservoir Rejuvenation Technology, or R2T) initiated in 2008 aims to deliver to the CSG industry a solution for the rapid replenishment of methane in depleted or undersaturated coal seams to enable renewed production.

In collaboration with the industry, CSIRO has created a team of researchers who are conducting laboratory experiments to understand the processes involved in replenishment, and who are studying the microbes to determine the viability of using them to optimise gas generation. A long term field trial is in the planning stage, set to commence in 2017.

The results

Adding value to CSG production and increasing production as an energy source for Australia

If successful, the benefit for industry of this research will include a technology to increase the methane content of CSG reservoirs which could add considerable value to coal seam gas production and increase production of this energy source in Australia.

The overall benefits of the R2T project depend crucially on the adoption profile and actual achievement of CSG production. Most of this adoption takes place in the future, so impact analysis outcomes are associated with some uncertainty.

Looking at the midpoint of a range of impacts, our estimates suggest that the real project expenditure of $1.4 million by CSIRO could lead to:

  • Total benefits (measured as cost savings in CSG production, in real, present value terms ) between $0.7 million and $21.4 million, depending on the assumptions made;
  • A benefit cost ratio between 0.4:1 and 16:1.

Report Links

Contact us

Find out how we can help you and your business. Get in touch using the form below and our experts will get in contact soon!

CSIRO will handle your personal information in accordance with the Privacy Act 1988 (Cth) and our Privacy Policy.


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

First name must be filled in

Surname must be filled in

I am representing *

Please choose an option

Please provide a subject for the enquriy

0 / 100

We'll need to know what you want to contact us about so we can give you an answer

0 / 1900

You shouldn't be able to see this field. Please try again and leave the field blank.